This answer requires that we fill in the blanks. The answers are contained in the bullet to fill the missing places
This is the term that is used to refer to the net present value. This is the value that is calculated as the difference between the cash inflows and out flows for over a time period.
In order to get the NPV we have to make the following calculations for the projects A and B.
We have:
For Project A
-900 + 620/1.08 + 395/1.08² + 200/1.08³ + 250/1.08⁴
= $355. 237
project B
we would have
-900 + 620/1.08 + 395/1.08² + 200/1.08³ + 250/1.08⁴
= 378.98
The value for the project B happens to be greater than that of A hence this is the value that we have to accept