During 2019, Waterway Industries expected Job no. 59 to cost $300000 of overhead, $450000 of materials, and $200000 in labor. Waterway applied overhead based on direct labor cost. Actual production required an overhead cost of $245000, $520000 in materials used, and $170000 in labor. All of the goods were completed. How much is the amount of over- or underapplied overhead