Part C
One of the cutting machine is shut down for repairs How many parts can the remaining machines cut in
412 hours?
788 parts
2,363 parts
28,350 parts
47,250 parts
Enter answer here:
Part D
All of the machines are kept cool by circulating cold water through them. The water makes 1 complete cycle through a 30 foot long tube every 12 seconds. Correctly complete the statement about the distance traveled by the water in 3 minutes and number of complete cycles the water makes in 3 minutes.
Fill in the blanks to complete the sentence.
The water travels ______ feet and completes _______ cycles in 3 minutes.
Enter answers here: