Answer:
False
Explanation:
Within the relevant range of activities, total fixed costs remain constant and fixed costs per unit decrease as total output increases. Total variable costs vary depending on total output, but variable costs per unit should remain constant.
On a long term basis, all costs are variable, that is why it is important to consider the range of activities, i.e. output levels.