Answer:
295 units of Qa
and 129 untis of Qb
Explanation:
1/4Assembly hours x Qa + 1/3Assembly hoursx Qb = ASH
1/8 testing hours x Qb+ 1/3 testing hours x Qb = TSH
Profit = 9 x Qa + 8 x Qb
Assembly hours <= 90
testing hours <= 80
We also has to make the cosntrain that units should be integer as we cannot do half a unit.
We build this in solver to get the max profit.
A B C D
Units Assembly Testing Profit
295 0.25 0.125 9
129 0.125 0.33 8
89.88 79.88 3,687.00
(295 x 0.25 + 129 x 0.125)
(295 x 0.125 + 129 x 0.33)
(295 x 9 + 129 x 8)