Answer:
The correct answer is D.
Explanation:
Giving the following information:
The direct materials used cost $8.200. There were 179 direct labor hours worked on this job at a direct labor wage rate of $28.00 per hour. There were 90 machine hours used pm this job. The predetermined overhead rate is $37.00 per machine hour used.
Total cost:
Direct material= 8,200
Direct labor= 179*28=5,012
MOH= 37.00*90= 3,330
Total= $16,542