If an installation resistance lump test at the main switch fuse of very large installation gave a value of 0.45 megohms, the electrician should
A. Reverse the meters test leads and re-test B. Test each circuit separately C. Report the entire installation of being satisfactory D. Report the entire installation as being unsatisfactory