In a one-shift operation, if the operating time is 480 minutes and there is one 30-minute lunch break and two 15-minute rest breaks, what is the takt time if the demand rate is 70 units per day.
A - 10 minutes per cycle
B - 5 minutes per cycle
C - 6 minutes per cycle
D - 7 minutes per cycle
D - 8 minutes per cycle